Outdoor and Play—Building Playgrounds Children Love

“It is so successful we have had to introduce a rota… an overwhelming success” Site Superintendent Fieldhead Carr School Leeds

Quick contact

Pop your name and email in the form below and you’re half-way there.

Case study: St Stephens

Before

This project linked two previously separate areas of playground, using a covered stepped walkway and log edge retaining to deal with significant changes of level.

Before

The area was developed into a growing and planting area, with some play elements at each end.

After After After